翻訳と辞書
Words near each other
・ Brecciarola
・ Breceña
・ Brech
・ Brecha
・ Brecha (2009 film)
・ Brecha (newspaper)
・ Brechainville
・ Brechelsdorf
・ Brechelser Floß
・ Brechen
・ Brecher
・ Brecher Glacier
・ Brecherspitz
・ Brechfa
・ Brechfa Forest
Brechfa Forest Wind Farm
・ Brechfa Pool
・ Brechfa transmitting station
・ Brechhorn
・ Brechin
・ Brechin (disambiguation)
・ Brechin (Parliament of Scotland constituency)
・ Brechin All Records
・ Brechin and Edzell District Railway
・ Brechin Castle
・ Brechin Cathedral
・ Brechin City F.C.
・ Brechin High School
・ Brechin railway station
・ Brechin Victoria F.C.


Dictionary Lists
翻訳と辞書 辞書検索 [ 開発暫定版 ]
スポンサード リンク

Brechfa Forest Wind Farm : ウィキペディア英語版
Brechfa Forest Wind Farm

Brechfa Forest Wind Farm comprises two wind farms which are planned to be built in Brechfa Forest in Carmarthenshire in southwest Wales. The two wind farms are proposed by RWE npower renewables to be built in Strategic Search Area G, created as part of the Welsh Government's TAN8〔(WG TAN8 website )〕 policy, published in 2005.
The Brechfa Forest Wind Farm projects will comprise two applications for consent. The first, Brechfa Forest West Wind Farm, is likely to have a capacity of greater than 50MW therefore the application has been submitted to the Infrastructure Planning Commission. The second, Brechfa Forest East Wind Farm, will have a capacity of less than 50MW and therefore will be determined by Carmarthenshire County Council.
The Brechfa Forest West development, located near the Afon Pib valley will consist of 28 turbines with a maximum tip height of up to 145 metres each. An additional twelve turbines are proposed at Brechfa Forest East near Abergorlech. The turbines will have the capacity to generate around 56-84MW at Brechfa Forest West and 24-36MW at Brechfa Forest East with an installed capacity of 2-3 MW each. Each turbine will be around 145 metres high and has created opposition from local groups and activists.〔(Turbineaction.co.uk website )〕
As the Infrastructure Planning Commission ceased to exist from April 2012, the Brechfa Forest West application fell to the replacement National Infrastructure Planning section of the Planning Inspectorate to produce a recommendation for the Secretary of State at DECC. This recommendation, for approval, led to DECC confirming that development consent for Brechfa Forest West was granted on 12 March 2013.〔(NIPS website )〕
Carmarthenshire County Council Planning Committee approved the planning application for Brechfa Forest East at their 17 December 2013 meeting.〔(BBC website )〕
==See also==

*Infrastructure Planning Commission
*Planning Inspectorate

抄文引用元・出典: フリー百科事典『 ウィキペディア(Wikipedia)
ウィキペディアで「Brechfa Forest Wind Farm」の詳細全文を読む



スポンサード リンク
翻訳と辞書 : 翻訳のためのインターネットリソース

Copyright(C) kotoba.ne.jp 1997-2016. All Rights Reserved.